Methyl Bromide Phase-Out Project
Project Summary
Feb 2005. WP inclusion.During project preparation it appeared that:1) Ukraine wishes to retain capacity for MBr production.2) MBr consumption is significant.3) CTC was produced in one facility, mostly as feedstock for CFC-11/12 in the USSR. Ukraine seeks assistance to close that facility which has been idle since 1998.As a result, the project design addresses the above reality and seeks to:1) Phase out MBr consumption in the grain sector and reduce use for Quarantine and Pre-shipment.2) Permanently close the existing CTC production facility, and compensate the Oriana-Halev enterprise that owns it.3) Capacity building : policy development to support MBr phase out and institutional strengthening to increase the capacity of the Ministry of Environment to meeting its obligations to control and report on ODS phase out efforts.4) Project implementation, monitoring and evaluation.(As recorded by the PM at pipeline entry:"The proposed project aims to assist the Ukraine in achieving compliance with the Copenhagen Amdendment of the Montreal Protocol by enabling closure of its Methyl bromide production facilities and delivering technical assistance for other required control measures.")
Project Details
| GEF Project ID | 2147 |
| Project Type | Full-size Project |
| Status | Cancelled |
| Country | Ukraine |
| Region | |
| Focal Areas | |
| Funding Source | GEF Trust Fund |
| Implementing Agencies | The World Bank |
| Executing Agencies | Coordination Committee for Montreal Protocol Implementation. Specific components executed by Ministry of Agriculture or Ministry of Environmental Protection. |
| GEF Period: | GEF - 3 |
| Approval Fiscal Year: | 2005 |
Project Documents
Financials
| Project Preparation Grant Amount | 0 USD |
| GEF Project Grant | 5,100,000 USD |
| Co-financing Total | 4,910,000 USD |
| GEF Agency Fees | 423,000 USD |
| Total Cost | 10,010,000.00 USD |